
Scaffolding Sheet Supplier in Dubai & UAE
Looking for a reliable Scaffolding Sheet Supplier in Dubai & UAE? We stock premium scaffold sheeting (FR & Standard),
debris netting and tarpaulins—ready inventory, bulk pricing and fast delivery across all emirates.

iknas FR reinforced scaffold sheeting — close-up of mesh & laminated surface.


Sizes & Specifications
Standard rolls available in the UAE market:
Width | Length | Type | Typical Use |
---|---|---|---|
2 m (2mtr) | 50 m (50 mtr) | Reinforced / FR options | Low–mid height façades, internal partitions |
4 m (4 mtr) | 50 m (50 mtr) | Reinforced / FR options | High-rise façades, full elevation wraps |
Need a different cut size or printed branding? Ask our team for custom panels and logo printing.
Why choose our scaffolding sheets
- Durable & UV-stabilized: Designed for high heat, sun and dust.
- Fire-retardant (FR) options: Safety-focused grades for compliance.
- Reinforced mesh & eyelets: Tear-resistant with strong fixing strip.
- Custom sizes & printing: Rolls, panels and façade wraps with branding.
- Bulk pricing & fast logistics: Stock on hand; same-day dispatch on many SKUs.
Typical applications in the UAE
High-rise façades, interior renovations, bridge works, shipyards, event scaffolds and temporary enclosures. Our solutions help reduce dust migration, protect workers from wind-borne debris and improve paint or blasting quality during the region’s frequent dusty and humid conditions.
Coverage across the UAE
We supply Dubai, Abu Dhabi, Sharjah, Ajman, Umm Al Quwain, Ras Al Khaimah and Fujairah. Site-direct deliveries, easy reorders and clear ETAs help your project schedules stay on track.
How we help contractors deliver faster
- Specification match: We align with consultant specs and share datasheets for quick approvals.
- Cut-to-size services: Reduce waste and speed up installation on complex elevations.
- On-time deliveries: Morning bookings often ship the same day.
- After-sales support: Rapid supply of accessories and repeat orders.
Installation tips
- Start from the top and work downward with 10–15 cm overlaps.
- Use fixing discs/bungees on every bay; keep edge spacing tight.
- Combine mesh with sheeting on windy sites to reduce wind load.
- Fit zip doors at access points and keep repair tape for quick fixes.
For reference, see general safety guidance from construction authorities.
FAQs
Which scaffolding sheet is best for Dubai heat?
UV-stabilized polyethylene with reinforced hems performs best in strong sun and dust. Select GSM based on exposure and height of the scaffold.
Do you offer fire-retardant (FR) scaffold sheeting?
Yes. FR-rated options are stocked. Share your site’s safety requirement and we’ll match the compliant grade and provide test certificates.
What sizes are available?
We stock 2 m x 50 m and 4 m x 50 m rolls (also phrased as 2mtr x 50 mtr & 4 mtr x 50 mtr). Custom panels available on request.
Can you deliver across the UAE?
We deliver in all seven emirates—often same-day for stocked SKUs. Timed deliveries and site drop-offs are available.
What accessories are needed for installation?
Use bungee ties or cable ties with fixing discs. Add zip doors for access and keep repair tape for quick onsite maintenance.
Helpful links
Get a quote
Share your BOQ, preferred width (2 m or 4 m), FR requirement and site location. Our team will respond quickly with pricing and delivery schedules.
Call: +971 58 952 4042 |
WhatsApp: Chat on WhatsApp |
Email: sales@iknas.ae
Looking for a dependable Scaffolding Sheet Supplier in Dubai & UAE? We’re ready to help.